Modular Rooftop Solar PV with Power Purchase Agreement

How others did

Case studies

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt.

Tagline

Retail Chain Headquarters

A European retailer installed 500 kW of rooftop solar under PPA, meeting 40% of daytime demand with no CAPEX and saving €80k annually.

Tagline

University Campus Solar Roll-Out

A mid-sized university added 1.2 MW PV in two phases, financed through PPA. Achieved carbon neutrality target two years early.

Quick payback

Funding Path

2021

Select PPA Provider

Issue a short RFP to qualified solar developers, evaluating offers based on cost-per-kWh and maintenance terms.

2021

Negotiate Contract Terms

Secure a fixed-rate power purchase agreement with annual price escalation below projected utility inflation.

2021

Benefit from Tax Incentives

Though the provider claims tax credits, your organization can leverage municipal green building credits tied to on-site renewables.

Realize fast

Step-by-step realization plan

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt.

  • 2022

    1. Roof Feasibility Study

    Have the PPA developer survey roof load capacity, shading, and electrical interconnection points.

  • 2022

    2. Financial and Legal Review

    Review PPA contract with legal and finance teams, ensuring alignment with procurement regulations.

  • 2022

    3. Permitting and Approvals

    The developer handles municipal permits, grid interconnection, and insurance documentation in parallel.

  • 2022

    4. Installation & Commissioning

    Install pre-assembled racks and panels over 1–2 weeks, followed by inverter and metering setup.

  • 2022

    5. Monitoring & Reporting

    Access a web portal for real-time generation data and automated monthly performance reports to stakeholders.